Mix Plant 7 Upgrade

Client

James Hardie

Market

Processing Plants

Our Client was experiencing diminished capacity of its aging Mix Plant, which was undermining their operational productivity and plant reliability. With the need to execute a rapid replacement, James Hardie engaged the team at MJK Industries to design and deliver a new & improved Mix Plant whilst minimising production impact during the project. With all engineering, design, fabrication, installation and project management managed in-house, MJK Industries was able to facilitate the replacement of a new, improved Mix Plant and auxillary equipment, inclusive of mixers, screw conveyors, pipework, platforms and access.

Scope of Work involved full Project Management and supply of Engineering and Design, Fabrication, and Installation of the newly-designed Mix Plant, inclusive of:

  • Mixers;
  • Screw Conveyors;
  • All associated pipework;
  • Platforms; and,
  • Access.

Through demonstrated Project Management capabilities, the scope was expanded to include design, fabrication and installation of other replacement pipework in the area.

 

Total work completed ~$1.4m

MJK Industries successfully designed, fabricated, installed and project managed the replacement of aging Mix Plant, associated pipework, platforms and access ways on-time and on-budget. Through demonstrated capabilities in project execution, our scope was extended to include design, fabrication and installation of additional replacement pipework, making this an extensive part of the works undertaken. Working in collaboration with our Client, we were able to structure work to minimise operational impact, and the resulting newly installed Mix Plant and pipework has improved the Client’s production capacity and efficiency.

Explore our Recent Projects

A bridge under construction extends over a body of water towards a cityscape with tall buildings. A large, red construction crane involved in materials handling and a power line tower are visible in the background, and there are trees along the water's edge under a partly cloudy sky.

Riverside Conveyor Replacement

Riverside Industrial Sands

Learn more

An industrial setup with large steel pipes and bolts extended towards a tall platform structure, seamlessly integrating recycling practices. Yellow stair railing is visible to the right, indicating access to elevated levels within this circular economy framework. The background shows parts of the metal framework and a cloudy sky.

ASR Processing Plant

Sims Resource Renewal

Learn more