Riverside Conveyor Replacement

Client

Riverside Industrial Sands

Market

Materials Handling

Our Client, Riverside Industrial Sands (RIS), faced the complex challenge of removal & replacement of an aged and unserviceable conveyor system at their Newstead facility.

The site works posed challenges including working over water, 300 tonne crane operations adjacent to a transmission tower & power lines, removal and installation under and within existing structures, and most critically, maintaining RIS operations throughout.

  • Removal of existing aged and unserviceable CV1;
  • Work collaboratively with RIS assigned Design Team to refine final design of new conveyor system;
  • Fabrication and Installation of new 57m, 26 Tonne CV1 conveyor; and,
  • Project Management of all above works.

Challenges presented:

  • Working over the Brisbane River
  • 300 Tonne crane operations adjacent to transmission tower & power lines
  • Removal & installation of conveyor system from under & within existing structures and buildings; and,
  • Maintaining RIS operations throughout the works.

CV01 removal and replacement was completed by MJK Industries successfully on-time, on-budget, and with zero incidents. Our site team, in partnership with carefully selected crane contractors, devised innovative solutions to overcome challenges presented by a nearby transmission tower, power lines, existing structures, and working over the Brisbane River.

The new conveyor was fabricated in our Workshop, pre-assembled on-site to expedite installation, and installed with minimal disruption to the to RIS operations, ensuring production downtime was kept to an absolute minimum.

The meticulous planning and project management of the CV01 removal & replacement demonstrates MJK Industries’ capability in successfully delivering complex industrial installations, and reinforces our commitment to delivering positive operational outcomes for our Clients.

Explore our Recent Projects

An industrial setup with large steel pipes and bolts extended towards a tall platform structure, seamlessly integrating recycling practices. Yellow stair railing is visible to the right, indicating access to elevated levels within this circular economy framework. The background shows parts of the metal framework and a cloudy sky.

ASR Processing Plant

Sims Resource Renewal

Learn more

An industrial facility with a complex network of pipes, beams, and machinery. The structure includes green and purple pipes, metal railings, and a metal grating platform. Reminiscent of processing plants, the high ceiling features beams crisscrossing throughout the space.

Mix Plant 7 Upgrade

James Hardie

Learn more